9 June 2020 / Quality Alert

Quality Management System Manual (QMSM / QMS) Revision 8

In advance of the complete systems review and reaccreditation process commencing mid-October 2020, the Quality Management System Manual (QMSM) has been substantially revised to better reflect current company procedures.

This revision incorporates widespread amendments to content, but generally retains the previous structure. A complete list of changes has not been produced for this reason. 

Please review and provide feedback

Please review the QMSM in detail and provide feedback. All suggested amendments will be reviewed, and if approved will be included in a subsequent revision of the QMSM prior to the upcoming reaccreditation.

The recently updated Quality Management Plan (QMP) that sits below the QMSM will also be reviewed against this manual. If you have any proposed amendments to the QMP, please let us know.

Accredited Management Systems

Having accredited management systems is a prerequisite for government works and many other jobs – particularly institutional investors. 

These accreditations play a critical part in securing work for Hutchies.

Feedback

If you need additional support, please contact the QMS Team

Email QMS@hutchies.com.au

Other Recent Activities

View all activities
18 December / General

Congratulations all of our Hutchies' veterans and to the winner of Constructor of the Year 2024.

View More
30 October / Quality Alert

Engineered stone ban effective 1 July 2024

ALL engineered stone regardless of the silica content percentage will be banned


Alternative products must be considered and implemented on all projects.

The industry is shifting away from engineered stone due to the risks of respirable crystalline silica, which can cause silicosis and other silica-related diseases. Although the consultations are under way and there has been no official announcement by Federal or State Governments on the issue, the health and safety risks along with the uncertainty around this issue warrants a decision to ban all engineered products entering job sites nationally. The ban will take effect on 1 July 2024 and will extend to ALL engineered stone regardless of the silica content percentage. 

An update to this alert will be provided before the end of the year when the Federal and State Governments are expected to issue a formal decision on the ban. In the meantime, to mitigate the impact of potential delays and variations, the best approach is to inform the clients of the pending ban and to propose and seek approval for an alternative product. Similarly, ensure all future estimates have the stone specification qualified and priced accordingly.

Product alternatives going forward include:

Compact Laminates

  • Under 1% silica content
  • Extremely competitive pricing
  • Only comes in 12mm thickness
  • Heat resistance is an issue
  • Product not suitable for high end applications

Porcelain Surfaces

  • Under 10% silica content
  • Price dependant of product and supplier
  • Large variety of colours and thicknesses (4, 8, 12, 20 and 30mm)
  • Great resistance to staining, scratches, UV and heat
  • Good warranty terms

Acrylic Solid Surfaces

  • 0% silica content
  • More expensive alternative
  • Limited thickness availability
  • UV stable and heat resistant but direct heat exposure not advised
  • Minimising wastage through flexibility in sheet sizing
  • Seamless joints

Natural Stone*

  • Various silica content percentages
  • Variety of products at different price points available
  • Ongoing maintenance may be an issue
  • Unlikely to satisfy specific warranty requirements

*Although this alert does not directly impact natural stone, some types have high silica content so risk of using these on projects should be considered carefully.

For an up-to-date list of available products and their usability, click here.


More information

If you need additional support, please contact the Quality Team:

Phone 1300 HUTCHIES
Email QualityTeam@hutchinsonbuilders.com.au

View More