Hutchies strives for all of our projects to be run safely and efficiently.
We believe that if we can get the BIG 10 right, many other aspects of the project will also be right.
If you see anything on a Hutchies job that could be improved, you are encouraged to raise it with the Site Management Team so that it can be addressed.
The BIG 10 weekly inspection is to be completed in HammerTech.
Item 1
Item 2
Item 3
Item 4
Item 5
Item 6
Item 7
Item 8
Item 9
Item 10
Maintain a clean site free from trip hazards.
Safe access and egress to all work areas is provided and maintained.
Scaffold is correctly assembled, easily accessible and free from debris and trip hazards at all times.
Please get in touch with the Hutchies Scaffold Yard
All penetrations greater than 100mm are to be protected to prevent falls and falling items.
Exposed edges are to be identified with suitable controls in place to prevent falls or falling objects.
All offices, crib rooms and toilets are to be kept clean and tidy at all times.
Minimise the risk associated with temporary power.
To provide adequate lighting for general access / egress, emergencies and task activities.
To have emergency equipment and signage in place and maintained for the duration of construction.
To protect members of the public and workers in construction zones at all times by implementing safe traffic management practices.