16 December 2021 / Notice

Site Shutdown & Summer Weather Preparation

These events, which range from cyclones, rain, hail, flooding, high winds and bushfires have the potential to cause damage to Hutchies' project sites, and adjacent properties and assets.

Since the beginning of Summer 2021 our sites have already braved significant wet weather, and the forecast predicts a lot more to come.

To ensure we're prepared for these weather events and to keep our sites safe and secure, we need to fully implement Hutchies' shutdown and storm preparation processes prior to the holiday break.

This includes checking that the sediment and erosion controls are in place and effective for any projects where we have open ground and soil stockpiles that could potentially cause impact to the environment.

Hutchies' shutdown checklist is on HammerTech > Inspections:
HB-HSEQ-F-084 Site Shutdown Storm Preparation Checklist

Storm Preparation (HE02)

Other Recent Activities

View all activities
10 October / Update

Make sure bin chute systems are installed correctly, following the tested systems and the manufacturers’ instructions.

Check the detailed drawings from Elephant’s Foot and Wastech for different wall types (plasterboard, shaft-liner, speed panel, concrete, Hebel, and masonry).

Any changes to the tested systems must be approved by your project certifier, signed off by the fire engineer in the fire engineering report (FER), and accepted by the relevant state / territory fire service.

View More